Skip to main content

Verified

来源、主体与时间与首次落库记录一致。

文章 Microsoft-backed AI data center faces backlash over 62 unpermitted gas turbines and 1.5M-gallon LNG tank — issues with $19.4B facility range from illegal construction to noise pollution
信任等级 Aggregate
发布主体
来源 https://www.tomshardware.com/tech-industry/data-centers/microsoft-backed-ai-data-center-faces-multiple-complaints-from-community-issues-range-from-unpermitted-gas-turbines-to-illegal-construction-and-noise-pollution
创建时间 Saturday, 29 August 2026 - 19:01
已记录哈希 16bfda8ea8e22a2b2091f814b744ad8a242b5be04e0322654ed8db967a01cd92
重算哈希 16bfda8ea8e22a2b2091f814b744ad8a242b5be04e0322654ed8db967a01cd92

哈希算法:sha256(来源URL|主体ID|创建时间戳),主体缺失时主体ID为 0

机器可读结果(JSON)